  1. DBL Ceramics Limited
    DBL Ceramics Limited
    Manager, Planning and Implementation, Gazipur, Dhaka, Bangladesh
    November, 2021-Present
    • Coordinated Bright Ceramics Project targeted production 90K SFT/Day, and worked with layout plan, machines sourcing, technical negotiations for finalization in Sylhet DBL Economic Zone; Space Capacity 5.5 Lacs SFT, Budget 250 core BDT
    • Made plan to produce Mosaic Tiles and sourced & purchased Press, Glaze, Kiln, Sorting & Packing production lines; Space Plan 30K SFT, Production Capacity 3.5K SFT/Day, Budget 10 core BDT
    • Sourced, procured and installed 3 Sorting & Packing Machines, Production Capacity 15k SFT/Day, Space Capacity 2800 SFT, Budget 5 core BDT
    • Served as a head of QCM and Sorting & Packaging Department and lead a team of 300 manpower with two Depots Dhaka & Bogura
    • Implemented Process Quality Control system by Oracle Software and Auto Mailing System to get updates of 6 production lines and Incoming Raw Materials
  2. Walton Hi-Tech Industries Limited
    Walton Hi-Tech Industries Limited
    Sr. Deputy Director, Project Coordinator, R&I, Electrical Appliances, Kaliakoir, Gazipur, Bangladesh
    June, 2015-Octobar, 2021
    • CABLE PROJECT - Led sourcing, procurement, and installation of cable and wire manufacturing machinery and materials optimization initiatives, including copper/brass melting furnaces, drawing, bunching, extrusion, coating, and coiling lines for cable and magnetic wire projects (≈ BDT 29 crore total budget), while standardizing metal sheets, reducing material wastage, resolving copper conductor quality concerns, and delivering cumulative cost savings of ≈ BDT 1.85 crore.
    • Compressor Manufacturing Plant - Established and upgraded compressor manufacturing quality infrastructure, procuring and installing 85+ metallurgical and magnetic wire testing machines (≈ BDT 4.3 crore budget), developing a cost-effective metallographic analysis system, setting up two advanced material testing labs with a 55-member team, stabilizing process quality, reducing process loss from 10% to 2%, and achieving annual savings of ≈ BDT 1M.
    • Screw Manufacturing Project - Implemented and successfully commissioned a screw manufacturing project, installing a mild steel wire drawing line, pit-type annealing furnace, and heat treatment furnace (≈ BDT 2.5 crore budget), while receiving project management training, benchmarking global best practices through factory visits and industrial fairs in Thailand and Taiwan, and delivering the project on schedule.
  3. Kabir Steel and Re-Rolling Mills (KSRM)
    Kabir Steel and Re-Rolling Mills (KSRM)
    Senior Engineer, Shift in Charge, Production Department - Sitakunda, Chattogram, Bangladesh
    July, 2014-May, 2015
    • Stabilized steel melting process with proper scrap management and reducing heating cycle for 18MT furnace; time reduced 10-15 min/cycle
    • Standardized the proper chemical composition during alloy addition in steel melting furnace with spectroscopic analysis to get deserve properties; furnace capacity 18 MT
Education

My Education

2019 – 2021

Executive MBA

Institute of Business Administration (IBA)

University of Dhaka, Bangladesh

GPA: 2.97

2009 – 2014

BSc in Materials & Metallurgical Engineering

Bangladesh University of Engineering & Technology (BUET)

Bangladesh

GPA: 3.18

Home Articles Video